Title object

SS «Zaporizhia NPP»

Shape attend

General contractor

Customer

SS «Zaporizhia NPP» SE «NNEGC «Energoatom»

Terms of works

May 2017 - October 2017

Replacement of condenser of turbine К-1000-60/1500-2 Power unit No.3 Zaporizhia NPP

The project provides dismantling of 3 existing condensers type К-33160 and installationof new condensers type К-38080 produced by PJSC «Turboatom».
Purpose of replacement of 3 existing condensers К-33160 turbine К-1000-60/1500-2 Power unit No.3 Zaporizhia NPP with new updated condensers К-38080 is:

  • exclusion of materials which contain cooper from equipment of 2nd circuit of turbine plant;
  • enhancement of leak-proof parameters of piping systems of condensers and reliability improvement of operation and operability;
  • obtaining  increased design pressure of steam in condensers at design temperatures of cooling water;
  • obtaining  life extension of electric power capacity of turbine plant on generator terminals;
  • life extension of updated condensers.