Information about the project

Project status

Completed project

Category

Energy and industrial engineering

Title object

New Safe Confinement at SSE CNPP

Shape attend

General contractor

Customer

SSE «Chornobyl NPP»

Terms of works

April 2017 - May 2019

Construction of redundant electric boiler house for heat supply of New Safe Confinement (NSC) at SSE “Chornobyl NPP”

The project provides:

  • development of design documentation for construction of object (working design);
  • passing expert review of construction project with obtaining expert report regarding review of design documents (positive);
  • execution of construction and installation works including:
  • installation of 4 boilers total capacity 5 MW;
  • construction of boiler house and transformer substation buildings,
  • external and internal installation and electrical works,
  • laying external networks of cable lines,
  • laying external heat supply pipelines of drinking water,
  • startup and adjustment works;
  • execution of field supervision over construction of the object;
  • support of the Customer during commissioning of the object.