Information about the project

Project status

Current project

Category

Energy and industrial engineering

Title object

Нighly radioactive waste (HRW)

Customer

SSE “SERWM”

Terms of works

August 2018 - October 2019

Design of interim storage facility for highly radioactive waste (HRW)

Project provides execution of works for design of interim storage facility for highly radioactive waste (HRW), which is returned from the Russian Federation after reprocessing of spent nuclear fuel of Ukrainian NPPs.
Scope of works: development of design (Basic design stage) of storage with overall production capacity 1024 packaging canisters – that provides receipt and storage of 550 m3 vitrified HRW assuring 100 year storage period.
Control of process steps and equipment of main and auxiliary systems will be conducted by means of remote control from panels located remotely from process equipment and areas of high radiation hazard.
Design solutions will enable safe operation of the facility without deterioration of environmental situation and impact on the environment.