Information about the project

Project status

Current project

Category

Energy and industrial engineering

Title object

ECOTPP "Ivankiv"

Shape attend

General contractor

Customer

Biogasenergo LLC

Terms of works

August 2017 - December 2018

Reconstruction of 2nd stage of biofuel power plant 18MW in urban-type settlement Ivankiv, Kyiv oblast

The project provides:
∙ Correction of detailed design documentation;
∙ Additional delivery of main process equipment;
∙ Completion of construction and installation works of 2nd stage;
∙ Designing and introduction of APCS of the plant.

The power plant will operate with maximum automation level of all processes for this technology, while flue gas cleaning system will assure emissions level which meets European standards.