Extension of the service life of Power Unit No. 2 piping at the OP Rivne NPP

07.02.2011 Works on renewal of the service water pipes of using systems have been completed; Drains and air vent of I, II, III safety systems have been replaced.
The works were carried out as part of the "Safety Improvement Concept for Operating NPP Power Units”.
Employer: OP Rivne NPP of SE NAEK Energoatom.