Installation of emulsifiers at the Dobrotvir TPP

09.02.2011 The Company has obtained an acceptance of the bid for installation of battery-powered emulsifiers at the Unit No.7 of Dobrotvir TPP.
Installation of emulsifiers will enable to ensure a high operational reliability of the ash collector, as well as in several times reduce emissions of ash and sulfur oxides.
Employer: ОАО ZapadEnergo.