Implementation of advanced cost-effective solutions ua en
 


Current Projects


Conducting experimental-adjustment works using full-scale large simulators of main process equipment of Central Spent Fuel Storage Facility (CSFSF)

Object:

CSFSF

Form of participation:

Prime contract

Customer:

SE «NNEGC «Energoatom»

Project life (start - planned finish):

June 2016 - January 2018

The project provides execution of experimental-adjustment works using full-scale large simulators of main process equipment of Central Spent Fuel Storage Facility (CSFSF) for making technical decisions which comply with process of SNF handling at NPP Ukraine.
Goal of execution of works is determination of technical requirements to conducting experimental-adjustment works using full-scale large simulators of main process equipment of Holtec International for handling spent nuclear fuel. Large simulators are used instead of expensive equipment during examination of process rooms of reactor compartments and optimization of technological process for dispatch of spent nuclear fuel from power units.

Scope of works:

  • development of detailed design documents for fabrication of large simulators of main process equipment of Holtec International and for execution of experimental works;
  • fabrication of large simulators and large elements;
  • conducting set experimental-adjustment works at equipment of power units of SS “Rivne NPP”, SS “Khmelnytska NPP” and SS “South Ukraine NPP”;
  • development of examination reports (for 9 power units);
  • development of recommendations for optimization of main process equipment of Holtec International;
  • development of recommendations for optimization of main transportation-process equipment for handling spent nuclear fuel from NPP and premises of reactor compartments.

Возврат к списку

Our current projects

Construction of redundant electric boiler house for heat supply of New Safe Confinement (NSC) at SSE “Chornobyl NPP”

Design of biofuel power plant 46 MW

Construction of on-site spent nuclear fuel dry storage facility (ISF-2)

Conducting experimental-adjustment works using full-scale large simulators of main process equipment of Central Spent Fuel Storage Facility (CSFSF)

Pivdenteploenergomontazh, AT
vul. Lekha Kachynskoho 3, Bucha, Kiev obl.
08292, Ukraine
tel: +38 (044) 499-65-55; 499-65-33
fax: +38 (044) 499-65-57