UTEM Group’s projects

Current projects Completed projects

Fabrication of separator tanks of stainless steel

Fabrication of custom equipment for sulphuric acid storage

Construction of straw-fired boiler house

Replacement of К 1000-60/3000 turbine condensers at Khmelnytskyi NPP Unit 1

Construction of a cogeneration power plant based on gas piston engines

Engineering design a cogeneration plant for a foreign company producing soft drinks

Design, manufacturing and installation of 850 tons of custom equipment for a leading food company

Design works: Reconstruction. Modernization of the single-beam suspended electric crane 3.2 t.s. storage of fresh fuel of power units No. 1 and No. 2 of the Rivne NPP.

Reconstruction design of sewage treatment facilities of city Chernihiv

Startup and adjustment works of equipment of Central interim storage facility (CISF) at sites of power units SS RIVNE NPP, SS KHMELNYTSKA NPP AND SOUTH-UKRAINE NPP

Elaboration of design documentation (Basic Design and Detail Design stages) for new construction of chlor-alkali plant

Engineering a manufacturing and storage facility for Planeta Plastic LLC

Engineering design for retrofit of 30/5 t overhead electric crane retrofit on RIVNE NPP special building 2

Modernisation of overhead crane in reactor compartment of Rivne NPP Units 1 and 2

Construction of Complex of Industrial Facilities for Production of Industrial Gases and Liquids in Kryvyi Rih

Installation of scrubbers for the forced pressure suppression system at Units 1 and 2 of Khmelnytskyi NPP and at Unit 4 of Rivne NPP

Construction of iron removal plant with reconstruction of third lift pump station in the city of Ternopil

Supplying 860 kW RAU straw-fired heat generators for VITAGRO Group

Development of Detail Design for ‘New Safe Confinement (NSC), startup complex 2. Disassembly of unstable structures of Chornobyl NPP Shelter Facility as part of early disassembly’

Developing design specifications and estimates for installation of drinking water fine purification system on the third lift pump station in Chernihiv

Develop a feasibility study of construction of a thermal and electric energy generation centre for a prospect factory for processing agricultural products

Fabrication and supply of pipeline components for Azot, Cherkasy

Fabrication and supply of pipeline parts, elements and assembly units for Khmelnytskyi NPP

Fabrication and supply of seamless welded pipeline components of carbon and low-alloy steel for Zhytomyrteplokomunenerho UC

Technical re-equipment and replenishment of the nuclear fuel holding pool at Unit №1 of Khmelnitsky NPP

Construction of a dry storage facility for spent nuclear fuel (ISF-2) at the ChNPP

Introduction of innovative technology of thermal handling of secondary waste of paper-cardboard production for PJSC Kyiv Cardboard and Paper Mill

Technical re-equipment and implementation of SFP and SG makeup system under prolonged complete NPP blackout at Rivne NPP Unit 3

Technical reequipping and introduction of system for forced “unfiltered” pressure release from active gas purification at power unit NO.4 OF Rivne NPP

Technical re-equipment and implementation of the forced pressure suppression system with active gas purification, and installation of filtering equipment at Units 1, 2 of Khmelnytskyi NPP SS

Design of interim storage facility for highly radioactive waste (HRW)

Project of a power plant on biofuel with a capacity of 46 MW

Technical re-equipment of power unit № 1 of Khmelnitsky NPP

Reconstruction of Salyvonky sugar plant

Construction of a backup electric boiler house to provide heat supply to the new safe confinement (NSC) at the Chornobyl NPP

Development of design estimates for the replacement of the condenser of the turbine unit K-1000-60-1500/2 of power unit No. 2 of the Zaporizhzhya NPP

Modernization of PRJSC Vetropack Gostomel glass factory

Replacement of condenser of turbine К-1000-60/1500-2 powder unit No.4 Zaporizhia NPP

Construction of Centralized Spent Fuel Storage Facility of VVER reactors of Ukrainian nuclear power plants (CSFSF)

Replacement of condenser of turbine К-1000-60/1500-2 Power unit No.3 Zaporizhia NPP

Technical re-equipment of the technological equipment of tank economy of object of leaching of LLC Nikolaev alumina plant

Development of CMP and WEP for replacement of turbine condenser of power unit No.3 ZNPP

Development of a project for the construction of a MINI-CHPP on biofuel

Manufacturing of metal structures for overhaul of the main building No. 2 OTSDT PJSC SUMYKHIMPROM

Reconstruction of sintering machine gas purification systems № 1-12 (sintering zone) and reconstruction of obsolete sintering machine gas purification systems № 7-12 at PJSC MMK named after Ilyich

Conducting experimental-adjustment works using full-scale large simulators of main process equipment of Central Spent Fuel Storage Facility (CSFSF)

Reconstruction of open switchgear 750 kV of Rivne NPP

Replacement of condenser ТГ-2 on power unit №2 South-Ukraine NPP

Overhaul of the boiler unit TP-87 of Kalush CHP

Construction of an air separation unit for AIR LIQUIDE

Design of a warehouse complex for KYIV CARDBOARD AND PAPER PLANT PJSC

Construction of a complex for the processing of radioactive waste at the Rivne NPP

Completion of project for creation of automatic process control system of liquid waste processing plant (APCS LWPP) of Chernobyl NPP

Construction of a gas piston cogeneration unit for the COCA-COLA Plant in Ukraine

Adjustment of the hydraulic mode of operation of thermal networks in Chernobyl

Technical re-equipment of pumping stations in Chernihiv

Overhaul of the TP-100 boiler unit at the power unit № 3 of Burshtyn TPP

Environmental and thermal tests of boilers for the production and heating boiler house of the Chernobyl NPP

Construction of an energy source to provide heat and electricity to Kyiv PDA PJSC

Extension of the service life of pipelines of the SVB power unit No. 3 of the OP Rivne NPP

Modernization of sewage pumping stations in Cherkassy

Construction of cogeneration power plant for Crimean Soda Plant JSC

Technical re-equipment of power unit No. 4 of Kalushskaya CHPP

Arrangement of external lightning protection of the Shelter Object of SSE ChNPP. Physical protection and access control and management system

Construction of own energy source for mine № 10 Novovolynska

Installation of battery emulsifiers of the II generation at Dobrotvirskaya TPP

Construction of a complex for the production of sulfuric acid for CRIMEAN TITANIUM PJSC

Reassignment of the service life of the pipeline systems of the power unit No. 2 of the South Ukraine NPP

Overhaul of the boiler unit and turbine of Art. № 1 Kalush CHP

Construction of a melamine production plant at Nevinnomyssk Azot JSC, Russia

Construction of a power unit for LUKOIL Energy and Gas Ukraine

Extension of the service life of the pipelines of the power unit № 2 of the Rivne NPP

Testing of driven piles under the project “Design, construction and commissioning of the NSC” over the Shelter object at the ChNPP

Expansion of urea production at the Russian chemical plant NAK AZOT

Installation of lifting mechanisms of the Dnestrovskaya PSPP

Modernization of the boiler unit st. No. 9 Kramatorsk CHP

Production of parts of high pressure boilers and pipelines for Gerada CHP (Morocco)

Reconstruction of the Lokhvitsky sugar plant

Improving the safety of the Shelter object of the Chernobyl NPP

Modernization of the spent nuclear fuel management system

Modernization of production facilities of Ovruch mining and processing plant QUARTZIT JSC

Replacement of steam generators at Yuzhno-Ukrainsk NPP

Construction of a plant for the processing of liquid radioactive waste (LRWTP) at the ChNPP

Reconstruction and renewal of equipment of CHP at the State Enterprise Production Association Southern Machine-Building Plant named after А. М. Маkаrоv

Construction of the concentrator of VK Mine Krasnoarmeyskaya-Zapadnaya 1 JSC

Reconstruction and technical reequipment of the CHP ST-1 (Kyiv)

Construction of cement grinding plant MYKOLAYIVCEMENT PRJSC

Industrial Complex for Solid Radioactive Waste Management (ICSRM) at the Chernobyl NPP

Development of a feasibility study for the construction of heat and electricity for PJSC LUKOIL-Odessa-Refinery

Overhaul of power unit No. 5 of Burshtyn TPP

Designing and construction of a person change facility for 1430 places at Shelter object of ChNPP

Modernization of power unit № 4 at the Starobeshevo HPP

Construction of power plant with capacity of 6 MWt at the SSC “Titan”

Technological equipment and constructions assembling at Rivne NPP Unit №4

Stabilization measures in the ChNPP “Shelter” Object

Replacement of steam generators at South-Ukrainian NPP

Modernization of Dust Suppression System (MDSS) at the Schelter Object of ChNPP

Boiler plant construction at the Kupyansk milk and cans center

Construction of Production and heating Boiler-room (PHB) at ChNPP

Nuclear and thermal power objects (capacity more then 100 МWt) in construction of which the company took part during 1961–2000 years

Heat power objects (capacity up to 100 МWt) in construction, erected between 1967–1998 years with the assistance of the company

Energy objects of industrial enterprises, erected between 1967 – 1998 years with the assistance of the company